Turn messy product specs into supplier-ready manufacturing plans.

Estimate prototype risk, supplier paths, machining complexity, and lead times before the first PO is sent.

Live product preview

Prototype readiness

82 / 100

Needs DFM cleanup before supplier release

Cost range

$4,180 – $5,420

Lead time

12–18 days

Problem

Prototype planning still lives in spreadsheets and supplier threads.

Teams ship drawings before they know whether the process, tolerance stack, finish spec, or geography can actually hit the date they promised.

Workflow

01

Capture product type, material, tolerance, and finish requirements

02

Map compatible manufacturing methods and supplier routes

03

Estimate prototype cost range and lead-time windows

04

Flag QA risk, bottlenecks, and missing supplier packet items

Use cases

Hardware startup pilot

Pressure-test a first enclosure build before locking a contract manufacturer.

Mechanical design review

See whether tolerance targets survive the process you picked on the drawing.

Sourcing handoff

Package a supplier-ready checklist instead of forwarding a loose STEP file.

Dashboard preview

One build command surface for readiness, routing, cost, and QA.

Prototype build planner

Capture the build profile suppliers need before they quote.

Tolerance level

Prototype readiness

82

/ 100

Needs DFM cleanup

Recommended route

CNC milling via Domestic West

Aluminum 6061 is a metal route with machinability score 90%.

Process fallback: CNC milling

Cost estimate

$1,550$2,010

Midpoint $1,780 for 5 prototype units

Low case

$1,550

Expected

$1,780

High case

$2,010

Lead-time tracker

Optimistic

14d

Expected

17d

Conservative

21d

DFM review

3 day window

active

CNC programming

4 day window

upcoming

First article

5 day window

upcoming

Finish + QA

6 day window

upcoming

Ship

7 day window

upcoming

Supplier route map

Domestic West

3 hubs
San JosePortlandPhoenix
  1. 1DFM review
  2. 2CNC programming
  3. 3First article
  4. 4Finish + QA
  5. 5Ship

Primary geography: US West

Pilot quantity: 5 units of Aluminum 6061

No single hard blocker detected in routing plan.

Manufacturing risk

Enclosure / housing at Standard (±0.2 mm) pushes CNC milling into medium inspection load.
Bead blast adds cosmetic acceptance criteria before release.
Tolerance target aligns with the selected process window.

Bottlenecks

No hard bottlenecks flagged for this build profile.

Supplier-ready checklist

Release STEP + PDF with hole callouts and finish notes

ready

Required before quote release

Attach material spec and acceptable alternates

attention

Required before quote release

Mark critical-to-function dimensions for first article

attention

Required before quote release

Document Bead blast acceptance and masking rules

attention

Required before quote release

Confirm 5-unit pilot scope and spares policy

ready

Required before quote release

Lock supplier route through Domestic West

ready

Required before quote release

Pricing

Startup

$249/mo

One active build planner, supplier packet export, and readiness scoring.

Compare plans

Hardware Team

$890/mo

Shared dashboard, route comparisons, and QA risk tracking across programs.

Compare plans

Enterprise

Custom

Multi-site routing, procurement workflows, and supplier governance.

Compare plans

FAQ

Does ForgeFlow replace my CM?

No. It prepares the manufacturing plan, risk profile, and supplier packet your team or CM still executes.

Are the estimates binding quotes?

No. They are planning ranges built from process, geography, finish, and quantity inputs.

Can I compare supplier routes?

Yes. Geography selection changes route hubs, lead-time windows, and checklist requirements.

Ship the supplier packet before the schedule slips.

Run the prototype build planner and walk into sourcing with cost ranges, route options, and QA risk already mapped.